— Projects
On the ground.
A selection of recent pours across the Carolinas — subdivisions, commercial pads, custom homes, and full site infrastructure.
— Featured project
Beacon — Burdette St.
Curb, gutter, and ADA-accessible sidewalk work along Burdette Street — forming, pouring, and finishing pedestrian infrastructure tied into new curb line.
Placing and screeding a fresh sidewalk pour — crew works the mix as the Metrocon truck discharges.
— Featured project
Global Drive.
Roadway curb, gutter, and sidewalk build-out along Global Drive — long-run pedestrian infrastructure with ADA-compliant curb ramps and drainage tie-ins.

New curb and roadside sidewalk placed along Global Drive — fresh pour with backfill still to be dressed in.
— Featured project
HWY 418 — Chick-fil-A.
Site concrete package for a new Chick-fil-A off HWY 418 — cast-in-place retaining walls, highway-frontage curb and sidewalk, and pad-ready flatwork.

New roadside sidewalk and curb along HWY 418 fronting the future Chick-fil-A pad — highway frontage tie-in underway.
— Featured project
Sherwood St.
Custom-home flatwork on Sherwood Street — entry stoop tied into brick step treads, ribbon-strip driveway, and finished apron from garage to street.

Front entry stoop poured and finished — tied into brick step treads and knee walls at a custom home.






